Whiteside, IL interconnection queue
6 active projects totalling 396.6 MW in the PJM queue, plus 7 with terminal status (shown greyed).
6active projects
396.6active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-462 | Gipper Solar Farm | 345 | 153 | Solar | EP |
| AH2-376 | Garden Plain 138 kV | 138 | 153 | Battery | Withdrawn |
| C01-1587 | Garden Plain 138 kV | 138 | 150 | Battery | Active |
| AI1-171 | Garden Plain - Rock Falls 138 kV | 138 | 60 | Solar | Withdrawn |
| AH2-270 | Garden Plain 138 kV | 138 | 51 | Wind | Withdrawn |
| AD2-214 | Rock Falls-Garden Plains | n/r | 40.8 | Solar | Withdrawn |
| C01-1622 | Normandy 138 kV | 138 | 40 | Wind | Active |
| AG2-674 | Quad Cities - Sterling Steel 345 kV | 345 | 37.3 | Wind | Withdrawn |
| AF1-296 | Gipper Wind Farm | 138 | 33.6 | Wind | EP |
| C01-1588 | Garden Plain 138 kV | 138 | 20 | Wind | Active |
| AD2-041 | Normandy | n/r | 11.6 | Solar | Withdrawn |
| AG1-044 | Rock River ESS | n/r | 0 | Battery | In Service |
| Q87 | Quad Cities 345kV | 345 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.