Substation Scout

Whiteside, IL interconnection queue

6 active projects totalling 396.6 MW in the PJM queue, plus 7 with terminal status (shown greyed).

6active projects
396.6active MW
13total filed
Queue IDProjectkVMWResourceStatus
AG1-462 Gipper Solar Farm 345 153 Solar EP
AH2-376 Garden Plain 138 kV 138 153 Battery Withdrawn
C01-1587 Garden Plain 138 kV 138 150 Battery Active
AI1-171 Garden Plain - Rock Falls 138 kV 138 60 Solar Withdrawn
AH2-270 Garden Plain 138 kV 138 51 Wind Withdrawn
AD2-214 Rock Falls-Garden Plains n/r 40.8 Solar Withdrawn
C01-1622 Normandy 138 kV 138 40 Wind Active
AG2-674 Quad Cities - Sterling Steel 345 kV 345 37.3 Wind Withdrawn
AF1-296 Gipper Wind Farm 138 33.6 Wind EP
C01-1588 Garden Plain 138 kV 138 20 Wind Active
AD2-041 Normandy n/r 11.6 Solar Withdrawn
AG1-044 Rock River ESS n/r 0 Battery In Service
Q87 Quad Cities 345kV 345 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.