Kewanee-Streator substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-121 Kewanee-Streator 138 kV 138 51.9 Wind Withdrawn
AC1-168 Hickory Wind n/r 10.2 Wind Pending Termination

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.