Crescent Ridge substation interconnection queue

2 active projects totaling 28.7 MW in the PJM queue, plus 4 with terminal status (shown grayed).

6 PJM queue filings name Crescent Ridge as the point of interconnection, all in Bureau County, IL.

Target commercial operation dates as filed run from Nov 2010 to Oct 2021 (6 filings).

Transmission owner as filed: ComEd (2 filings).

2active projects
28.7active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-214 Lone Tree Wind n/r 19 Wind In Service Dec 2020
AD1-066 Crescent Ridge n/r 9.9 Solar Withdrawn Oct 2019
Z1-072 Crescent Ridge Wind Farm n/r 9.7 Wind In Service Dec 2014
P40 Providence Heights WF 138 4 Wind Withdrawn Nov 2010
AF2-070 Crescent Ridge 138 kV 138 3.1 Wind Withdrawn Oct 2021
AF2-069 Lone Tree Wind Farm 138 2 Wind Withdrawn Oct 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Bureau County, IL

All 23 PJM queue filings in Bureau County, IL.