Crescent Ridge substation interconnection queue
2 active projects totaling 28.7 MW in the PJM queue, plus 4 with terminal status (shown grayed).
6 PJM queue filings name Crescent Ridge as the point of interconnection, all in Bureau County, IL.
Target commercial operation dates as filed run from Nov 2010 to Oct 2021 (6 filings).
Transmission owner as filed: ComEd (2 filings).
2active projects
28.7active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-214 | Lone Tree Wind | n/r | 19 | Wind | In Service | Dec 2020 |
| AD1-066 | Crescent Ridge | n/r | 9.9 | Solar | Withdrawn | Oct 2019 |
| Z1-072 | Crescent Ridge Wind Farm | n/r | 9.7 | Wind | In Service | Dec 2014 |
| P40 | Providence Heights WF | 138 | 4 | Wind | Withdrawn | Nov 2010 |
| AF2-070 | Crescent Ridge 138 kV | 138 | 3.1 | Wind | Withdrawn | Oct 2021 |
| AF2-069 | Lone Tree Wind Farm | 138 | 2 | Wind | Withdrawn | Oct 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Bureau County, IL
- Nelson-Electric Junction: 6 active, 620 MW of 16 filed
- Normandy: 3 active, 127.4 MW of 5 filed
- Lee County: 1 active, 48 MW of 3 filed
- Mendota: none active of 4 filed
- Crescent Ridge (CIR Increase): none active of 2 filed
- Kewanee-Streator: none active of 2 filed
Site Scanner