Substation Scout

Bureau, IL interconnection queue

5 active projects totalling 286.5 MW in the PJM queue, plus 18 with terminal status (shown greyed).

5active projects
286.5active MW
23total filed
Queue IDProjectkVMWResourceStatus
C01-1439 Kewanee - Putnam 138 kV 138 195 Hybrid Active
AI2-487 Kewanee-Hennepin Tap 138kV 138 97.2 Wind Withdrawn
AG1-121 Kewanee-Streator 138 kV 138 51.9 Wind Withdrawn
P36 Big Sky 345 48 Wind In Service
P20 Walnut Ridge Wind Farm 345 42 Wind Withdrawn
AG1-435 Kewanee-Hennepin 138 kV 138 35.2 Wind Withdrawn
R59 Nelson-Lee County Energy Ctr 345kV 345 32 Wind Withdrawn
P21 McGirr Road - Dixon 138kV 138 30 Wind Withdrawn
P37 Normandy 138kV 138 28 Wind Withdrawn
T106 Lee County n/r 28 Wind Withdrawn
AI2-400 Crescent Ridge 138kV (CIR Increase) 138 25 Wind Withdrawn
AI2-428 Crescent Ridge 138kV (CIR Increase) 138 20.1 Wind Withdrawn
AC1-214 Lone Tree Wind n/r 19 Wind In Service
R88 Providence Heights #2 138kV 138 15 Wind Withdrawn
O35 Providence Heights WF 138 14.8 Wind In Service
AD1-066 Crescent Ridge n/r 9.9 Solar Withdrawn
W4-019 Mendota n/r 9.8 Wind Withdrawn
Z1-072 Crescent Ridge Wind Farm n/r 9.7 Wind In Service
P40 Providence Heights WF 138 4 Wind Withdrawn
S53 Lee County E.C. 345kV 345 4 Wind Withdrawn
AF2-070 Crescent Ridge 138 kV 138 3.1 Wind Withdrawn
AF2-069 Lone Tree Wind Farm 138 2 Wind Withdrawn
R46 Providence Heights #1A 138kV 138 1.8 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.