Bureau, IL interconnection queue
5 active projects totalling 286.5 MW in the PJM queue, plus 18 with terminal status (shown greyed).
5active projects
286.5active MW
23total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1439 | Kewanee - Putnam 138 kV | 138 | 195 | Hybrid | Active |
| AI2-487 | Kewanee-Hennepin Tap 138kV | 138 | 97.2 | Wind | Withdrawn |
| AG1-121 | Kewanee-Streator 138 kV | 138 | 51.9 | Wind | Withdrawn |
| P36 | Big Sky | 345 | 48 | Wind | In Service |
| P20 | Walnut Ridge Wind Farm | 345 | 42 | Wind | Withdrawn |
| AG1-435 | Kewanee-Hennepin 138 kV | 138 | 35.2 | Wind | Withdrawn |
| R59 | Nelson-Lee County Energy Ctr 345kV | 345 | 32 | Wind | Withdrawn |
| P21 | McGirr Road - Dixon 138kV | 138 | 30 | Wind | Withdrawn |
| P37 | Normandy 138kV | 138 | 28 | Wind | Withdrawn |
| T106 | Lee County | n/r | 28 | Wind | Withdrawn |
| AI2-400 | Crescent Ridge 138kV (CIR Increase) | 138 | 25 | Wind | Withdrawn |
| AI2-428 | Crescent Ridge 138kV (CIR Increase) | 138 | 20.1 | Wind | Withdrawn |
| AC1-214 | Lone Tree Wind | n/r | 19 | Wind | In Service |
| R88 | Providence Heights #2 138kV | 138 | 15 | Wind | Withdrawn |
| O35 | Providence Heights WF | 138 | 14.8 | Wind | In Service |
| AD1-066 | Crescent Ridge | n/r | 9.9 | Solar | Withdrawn |
| W4-019 | Mendota | n/r | 9.8 | Wind | Withdrawn |
| Z1-072 | Crescent Ridge Wind Farm | n/r | 9.7 | Wind | In Service |
| P40 | Providence Heights WF | 138 | 4 | Wind | Withdrawn |
| S53 | Lee County E.C. 345kV | 345 | 4 | Wind | Withdrawn |
| AF2-070 | Crescent Ridge 138 kV | 138 | 3.1 | Wind | Withdrawn |
| AF2-069 | Lone Tree Wind Farm | 138 | 2 | Wind | Withdrawn |
| R46 | Providence Heights #1A 138kV | 138 | 1.8 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.