Normandy 138 kV

PJM queue ID C01-1622

Normandy 138 kV (C01-1622) is listed in the PJM interconnection queue as a 40 MW wind project in Whiteside County, IL. The filing names Normandy as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 1, 2027.

Queue IDC01-1622
Project nameNormandy 138 kV
Status (as published)Active
SubstationNormandy
Point of interconnectionNormandy 138 kV
CountyWhiteside
StateIL
Voltage138 kV
Capacity40 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2027-12-01
Source datasetcycle

Same substation and county

Normandy substation: 5 requests in the PJM queue, 3 active totaling 127.4 MW.

Queue IDProjectMWResourceStatus
O29Green River Wind Farm Phase 245WindIn Service
O09Walnut Ridge Wind, LLC42.4WindIn Service
P37Normandy 138kV28WindWithdrawn
AD2-041Normandy11.6SolarWithdrawn

Whiteside, IL: 13 requests in the PJM queue, 5 active totaling 246.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperGreen River Wind Farm Phase 1, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity40.0
MFO194.25
Submitted date4/25/2026
Last updated6/24/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first