Garden Plain substation interconnection queue
3 active projects totalling 203.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
203.6active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-376 | Garden Plain 138 kV | 138 | 153 | Battery | Withdrawn |
| C01-1587 | Garden Plain 138 kV | 138 | 150 | Battery | Active |
| AH2-270 | Garden Plain 138 kV | 138 | 51 | Wind | Withdrawn |
| AF1-296 | Gipper Wind Farm | 138 | 33.6 | Wind | EP |
| C01-1588 | Garden Plain 138 kV | 138 | 20 | Wind | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.