Garden Plain substation interconnection queue

2 active projects totaling 53.6 MW in the PJM queue, plus 3 with terminal status (shown grayed).

5 PJM queue filings name Garden Plain as the point of interconnection, all in Whiteside County, IL.

Target commercial operation dates as filed run from Dec 2026 to Apr 2031 (5 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: ComEd (3 filings).

2active projects
53.6active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-376 Garden Plain 138 kV 138 153 Battery Withdrawn Oct 2027
C01-1587 Garden Plain 138 kV 138 150 Battery Withdrawn Apr 2031
AH2-270 Garden Plain 138 kV 138 51 Wind Withdrawn Dec 2026
AF1-296 Gipper Wind Farm 138 33.6 Wind EP Sep 2029
C01-1588 Garden Plain 138 kV 138 20 Wind Active Apr 2031

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05C01-1587Terminal status150 Active → Withdrawn

Other PJM queue substations in Whiteside County, IL

All 13 PJM queue filings in Whiteside County, IL.