Louisa-South Anna substation interconnection queue
1 active project totaling 61 MW in the PJM queue, plus 6 with terminal status (shown grayed).
7 PJM queue filings name Louisa-South Anna as the point of interconnection, all in Louisa County, VA.
Target commercial operation dates as filed run from Oct 2020 to Dec 2022 (7 filings).
Transmission owner as filed: Dominion (1 filing).
1active projects
61active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-301 | Louisa-South Anna 230 kV | 230 | 70 | Solar | Withdrawn | Dec 2022 |
| AB2-158 | Belcher Solar | 230 | 61 | Solar | In Service | Dec 2020 |
| AI2-153 | Louisa-South Anna 230 kV | 230 | 32 | Solar | Withdrawn | Dec 2022 |
| AE1-177 | Louisa-South Anna 230 kV | 230 | 19 | Solar | Withdrawn | Oct 2020 |
| AE2-026 | Louisa-South Anna 230kV | 230 | 19 | Solar | Withdrawn | Oct 2020 |
| AF1-079 | Louisa-South Anna 230 kV | 230 | 19 | Solar | Withdrawn | Nov 2021 |
| AE1-154 | Belcher Solar | 230 | 10 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Louisa County, VA
- North Anna - Midlothian: 2 active, 800 MW of 2 filed
- Remington CT - Elk Run: 2 active, 500 MW of 2 filed
- Louisa: 2 active, 203 MW of 5 filed
- North Anna: 4 active, 170 MW of 5 filed
- Columbia: 1 active, 0.5 MW of 4 filed
- Louisa-North Anna: none active of 4 filed
- Gordonsville: none active of 2 filed
- Greenwood DP - St. Johns DP: none active of 2 filed
- Paytes: none active of 2 filed
- St. Johns DP: none active of 2 filed