Substation Scout

Louisa-North Anna substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AF2-063 Louisa-North Anna 230 kV 230 90 Solar Withdrawn
AC2-094 Louisa-North Anna 230kV 230 63.3 Solar Withdrawn
AF2-037 Louisa-North Anna 230 kV 230 56.4 Solar Withdrawn
AG1-305 Louisa-North Anna 230 kV 230 37.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.