Gordonsville substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Gordonsville as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Aug 2027 to May 2031 (2 filings).
Transmission owner as filed: Dominion (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-676 | Gordonsville 230 kV | 230 | 1,275.9 | Gas | Withdrawn | May 2031 |
| AG1-469 | Turkey Solar | 34.5 | 9.4 | Solar | Withdrawn | Aug 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Gordonsville (DOM, 6 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Same name on other Substation Scout pages
Other sources that print a substation named “Gordonsville” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Gordonsville: Expansion Tracker, PJM planning: APS state not printed
Other PJM queue substations in Orange County, VA
- Louisa: 2 active, 203 MW of 5 filed
- Oak Green: 1 active, 150 MW of 3 filed
- Locust Grove-Paytes: 2 active, 40.3 MW of 3 filed
- Somerset: 2 active, 11.8 MW of 14 filed
- Lake of the Woods DP-Wilderness DP: none active of 2 filed
- Orange: none active of 2 filed
- Paytes: none active of 2 filed
- South Anna: none active of 2 filed
- Unionville: none active of 2 filed
Other PJM queue substations in Louisa County, VA
- North Anna - Midlothian: 2 active, 800 MW of 2 filed
- Remington CT - Elk Run: 2 active, 500 MW of 2 filed
- Louisa: 2 active, 203 MW of 5 filed
- North Anna: 4 active, 170 MW of 5 filed
- Louisa-South Anna: 1 active, 61 MW of 7 filed
- Columbia: 1 active, 0.5 MW of 4 filed
- Louisa-North Anna: none active of 4 filed
- Greenwood DP - St. Johns DP: none active of 2 filed
- Paytes: none active of 2 filed
- St. Johns DP: none active of 2 filed