Greenwood DP - St. Johns DP substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-208 Greenwood DP - St. Johns DP 115 kV 115 44.5 Solar Withdrawn
AG2-209 Greenwood DP - St. Johns DP 115 kV 115 20.8 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.