North Anna substation interconnection queue
4 active projects totaling 170 MW in the PJM queue, plus 1 with terminal status (shown grayed).
5 PJM queue filings name North Anna as the point of interconnection, all in Louisa County, VA.
Target commercial operation dates as filed run from May 2010 to Jan 2024 (5 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Q65 | North Anna Power Station Unit 3 | 500 | 1,570 | Nuclear | Withdrawn | Jan 2024 |
| S110 | North Anna Unit 1 | 500 | 65 | Nuclear | In Service | May 2010 |
| S112 | North Anna Unit 2 | 500 | 65 | Nuclear | In Service | May 2010 |
| S108 | North Anna Unit 1 | 500 | 20 | Nuclear | In Service | May 2010 |
| S109 | North Anna Unit 2 | 500 | 20 | Nuclear | In Service | May 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “North Anna” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- North Anna: Expansion Tracker, PJM planning: DOM state not printed
- North Anna: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Louisa County, VA
- North Anna - Midlothian: 2 active, 800 MW of 2 filed
- Remington CT - Elk Run: 2 active, 500 MW of 2 filed
- Louisa: 2 active, 203 MW of 5 filed
- Louisa-South Anna: 1 active, 61 MW of 7 filed
- Columbia: 1 active, 0.5 MW of 4 filed
- Louisa-North Anna: none active of 4 filed
- Gordonsville: none active of 2 filed
- Greenwood DP - St. Johns DP: none active of 2 filed
- Paytes: none active of 2 filed
- St. Johns DP: none active of 2 filed