Substation Scout

Gateway substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-417 Gateway 69 kV 69 30 Solar Withdrawn
AG1-418 Gateway 69 kV 69 30 Solar Withdrawn
AI2-412 Gateway 69 kV 69 12 Solar Withdrawn
AI2-413 Gateway 69 kV 69 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.