Louisa substation interconnection queue
2 active projects totaling 203 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name Louisa as the point of interconnection, all in VA.
Target commercial operation dates as filed run from May 2009 to Dec 2031 (5 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
2active projects
203active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1293 | Louisa 230 kV | 230 | 200 | Battery | Withdrawn | Dec 2031 |
| C01-1410 | Louisa 230 kV | 230 | 200 | Battery | Active | Oct 2031 |
| AA2-158 | Louisa 34.5kV | 34.5 | 14 | Solar | Withdrawn | Nov 2015 |
| AH1-229 | Louisa 230kV | 230 | 6 | Gas | Withdrawn | Apr 2025 |
| U4-009 | Louisa Gas Turbines Units 1 through 5 | 230 | 3 | Gas | In Service | May 2009 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-1293 | Terminal status | 200 | Active → Withdrawn |
Other PJM queue substations in Louisa County, VA
- North Anna - Midlothian: 2 active, 800 MW of 2 filed
- Remington CT - Elk Run: 2 active, 500 MW of 2 filed
- North Anna: 4 active, 170 MW of 5 filed
- Louisa-South Anna: 1 active, 61 MW of 7 filed
- Columbia: 1 active, 0.5 MW of 4 filed
- Louisa-North Anna: none active of 4 filed
- Gordonsville: none active of 2 filed
- Greenwood DP - St. Johns DP: none active of 2 filed
- Paytes: none active of 2 filed
- St. Johns DP: none active of 2 filed
Other PJM queue substations in Orange County, VA
- Oak Green: 1 active, 150 MW of 3 filed
- Locust Grove-Paytes: 2 active, 40.3 MW of 3 filed
- Somerset: 2 active, 11.8 MW of 14 filed
- Gordonsville: none active of 2 filed
- Lake of the Woods DP-Wilderness DP: none active of 2 filed
- Orange: none active of 2 filed
- Paytes: none active of 2 filed
- South Anna: none active of 2 filed
- Unionville: none active of 2 filed
Site Scanner