Midlothian substation interconnection queue

4 active projects totalling 282 MW in the PJM queue, plus 1 with terminal status (shown greyed).

4active projects
282active MW
5total filed
Queue IDProjectkVMWResourceStatus
U3-016 Midlothian 230kV 230 550 Gas Withdrawn
AG2-088 Midlothian 230 kV 230 150 Battery Active
C01-1292 Midlothian 230 kV 230 100 Battery Active
AF2-085 Dry Bridge Energy Center 34.5 20 Battery In Service
AH1-071 Midlothian 34.5 kV 34.5 12 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.