Kenzie Creek-Colby substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Kenzie Creek-Colby as the point of interconnection, all in Cass County, MI.
Target commercial operation dates as filed run from Dec 2022 to Dec 2028 (3 filings).
Transmission owner as filed: AEP (1 filing).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-284 | Kenzie Creek-Colby 138 kV | 138 | 75 | Battery | Withdrawn | Dec 2022 |
| AE1-170 | Wingstem Solar Energy Farm | 138 | 63 | Solar | Withdrawn | Dec 2025 |
| AH1-309 | Kenzie Creek-Colby 138 kV | 138 | 27 | Solar | Withdrawn | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-07 | AE1-170 | Terminal status | 63 | Suspended → Withdrawn |
Other PJM queue substations in Cass County, MI
- Cook-East Elkhart: 2 active, 1,085 MW of 2 filed
- Twin Branch - Argenta: 2 active, 384 MW of 2 filed
- Valley: 3 active, 111.9 MW of 10 filed
- Kenzie Creek-Stone Lake: 1 active, 100 MW of 2 filed
- Brody: none active of 2 filed