Brody substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Brody as the point of interconnection, all in Cass County, MI.
Target commercial operation date as filed: Dec 2025 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-473 | Brody 138 kV | 138 | 60 | Solar | Withdrawn | Dec 2025 |
| AI2-169 | Brody 138 kV | 138 | 24 | Solar | Withdrawn | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Brody” in MI. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Brody: Expansion Tracker, PJM planning: AEP state not printed
Other PJM queue substations in Cass County, MI
- Cook-East Elkhart: 2 active, 1,085 MW of 2 filed
- Twin Branch - Argenta: 2 active, 384 MW of 2 filed
- Valley: 3 active, 111.9 MW of 10 filed
- Kenzie Creek-Stone Lake: 1 active, 100 MW of 2 filed
- Kenzie Creek-Colby: none active of 3 filed