Barterbrook-Stuarts Draft substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-084 | Round Hill Solar | 115 | 49.8 | Solar | Withdrawn |
| AG1-537 | Barterbrook-Stuarts Draft 115 kV | 115 | 32 | Battery | Withdrawn |
| AG1-325 | Barterbrook-Stuarts Draft 115 kV | 115 | 26 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.