Lexington-Dooms substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-421 Lexington-Dooms 230 kV 230 120 Solar Withdrawn
AG1-422 Lexington-Dooms 230 kV 230 50 Battery Withdrawn
AI2-416 Lexington-Dooms 230 kV 230 50 Solar Withdrawn
S119 Lexington-Dooms 500kV 500 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.