Lexington-Dooms substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-421 Lexington-Dooms 230 kV 230 120 Solar Withdrawn
AG1-422 Lexington-Dooms 230 kV 230 50 Battery Withdrawn
AI2-416 Lexington-Dooms 230 kV 230 50 Solar Withdrawn
S119 Lexington-Dooms 500kV 500 0 Not reported Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.