Home / PJM / substation / Lexington-Dooms
Lexington-Dooms substation interconnection queue
0 active projects
totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0 active projects
0 active MW
4 total filed
Queue ID Project kV MW Resource Status
AG1-421
Lexington-Dooms 230 kV
230
120
Solar
Withdrawn
AG1-422
Lexington-Dooms 230 kV
230
50
Battery
Withdrawn
AI2-416
Lexington-Dooms 230 kV
230
50
Solar
Withdrawn
S119
Lexington-Dooms 500kV
500
0
Not reported
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.