Substation Scout

Stuarts Draft-Waynesboro substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AC2-112 Augusta Solar 115 103.1 Solar Withdrawn
AD1-042 Stuarts Draft-Waynesboro 115 kV 115 12.5 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.