Augusta, VA interconnection queue

2 active projects totalling 400 MW in the PJM queue, plus 15 with terminal status (shown greyed).

2active projects
400active MW
17total filed
Queue IDProjectkVMWResourceStatus
C01-1445 Dooms 230 kV 230 300 Battery Active
AI1-185 Valley 230 kV 230 210 Battery Withdrawn
AG1-195 Valley 230 kV 230 150 Hybrid Withdrawn
AG1-196 Grottoes 115 kV 115 150 Hybrid Withdrawn
AG1-421 Lexington-Dooms 230 kV 230 120 Solar Withdrawn
AC2-112 Augusta Solar 115 103.1 Solar Withdrawn
AI2-114 Verona - Weyers Cave 115 kV 115 100 Battery Withdrawn
C01-1363 Staunton - Trimbles Mill DP 115 kV 115 100 Hybrid Active
AI2-036 Craigsville-Staunton 115kV 115 60 Solar Withdrawn
AG1-422 Lexington-Dooms 230 kV 230 50 Battery Withdrawn
AI2-416 Lexington-Dooms 230 kV 230 50 Solar Withdrawn
AE1-084 Round Hill Solar 115 49.8 Solar Withdrawn
AG1-537 Barterbrook-Stuarts Draft 115 kV 115 32 Battery Withdrawn
AG1-325 Barterbrook-Stuarts Draft 115 kV 115 26 Hybrid Withdrawn
AC1-070 Stuarts Draft 23kV 23 13.3 Solar Withdrawn
AD1-042 Stuarts Draft-Waynesboro 115 kV 115 12.5 Battery Withdrawn
S119 Lexington-Dooms 500kV 500 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.