Kenzie Creek-Stone Lake substation interconnection queue
1 active project totaling 100 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Kenzie Creek-Stone Lake as the point of interconnection, all in Cass County, MI.
Target commercial operation dates as filed run from May 2028 to Dec 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
100active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-083 | Gemstone Solar | 69 | 100 | Solar | Under Construction | Dec 2028 |
| AF2-389 | Prairie Refuge Solar | 69 | 30 | Solar | Withdrawn | May 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cass County, MI
- Cook-East Elkhart: 2 active, 1,085 MW of 2 filed
- Twin Branch - Argenta: 2 active, 384 MW of 2 filed
- Valley: 3 active, 111.9 MW of 10 filed
- Kenzie Creek-Colby: none active of 3 filed
- Brody: none active of 2 filed