Southwest Michigan Energy Center (AD2-020) is listed in the PJM interconnection queue as a 61.9 MW solar project in Van Buren County, MI. The filing names Valley as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 31, 2028.

Queue IDAD2-020
Project nameSouthwest Michigan Energy Center
Status (as published)Engineering and Procurement
SubstationValley
Point of interconnectionValley 138 kV
CountyVan Buren
StateMI
Voltage138 kV
Capacity61.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-07-31
Source datasetserial

Same substation and county

Valley substation: 10 requests in the PJM queue, 3 active totaling 111.9 MW.

Queue IDProjectMWResourceStatus
AF1-161Decatur Battery Storage25BatteryEP
AG1-109Decatur Battery Storage25BatteryEP
AI1-185Valley 230 kV210BatteryWithdrawn
AG1-195Valley 230 kV150HybridWithdrawn
AD1-138Valley 138 kV65.8SolarWithdrawn
AE2-325Southwest Michigan Energy Center31.3BatteryWithdrawn
V4-016Valley 138kV26WindWithdrawn
AI2-340Valley 138 kV23.1SolarWithdrawn
U4-041Valley 13.2kV2OtherWithdrawn

Van Buren, MI: 18 requests in the PJM queue, 6 active totaling 1,221 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity61.9
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first