Argenta - Twin Branch substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Argenta - Twin Branch as the point of interconnection, all in Van Buren County, MI.
Target commercial operation dates as filed run from May 2028 to Dec 2029 (2 filings).
Transmission owner as filed: AEP (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-272 | Argenta - Twin Branch 345 kV | 345 | 123.9 | Solar | Withdrawn | Dec 2029 |
| AI2-358 | Argenta - Twin Branch 345 kV | 345 | 70 | Solar | Withdrawn | May 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AH1-272 | Terminal status | 123.9 | Active → Withdrawn |
Other PJM queue substations in Van Buren County, MI
- Valley: 3 active, 111.9 MW of 10 filed