Argenta - Twin Branch substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Argenta - Twin Branch as the point of interconnection, all in Van Buren County, MI.

Target commercial operation dates as filed run from May 2028 to Dec 2029 (2 filings).

Transmission owner as filed: AEP (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-272 Argenta - Twin Branch 345 kV 345 123.9 Solar Withdrawn Dec 2029
AI2-358 Argenta - Twin Branch 345 kV 345 70 Solar Withdrawn May 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AH1-272Terminal status123.9 Active → Withdrawn

Other PJM queue substations in Van Buren County, MI

All 18 PJM queue filings in Van Buren County, MI.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first