Argenta - Twin Branch substation interconnection queue
1 active project totalling 123.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
123.9active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-272 | Argenta - Twin Branch 345 kV | 345 | 123.9 | Solar | Active |
| AI2-358 | Argenta - Twin Branch 345 kV | 345 | 70 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.