Substation Scout

Gretna DP substation interconnection queue

1 active project totaling 19 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Gretna DP as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Dec 2020 to Sep 2021 (2 filings).

1active projects
19active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-145 Whitethorn Solar 69 19 Solar In Service Sep 2021
AE2-246 Gretna DP 69 kV 69 14 Solar Withdrawn Dec 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Pittsylvania County, VA

All 39 PJM queue filings in Pittsylvania County, VA.

Other PJM queue substations in Mecklenburg County, VA

All 61 PJM queue filings in Mecklenburg County, VA.