Substation Scout

Briery-Clover substation interconnection queue

1 active project totaling 54 MW in the PJM queue, plus 5 with terminal status (shown grayed).

6 PJM queue filings name Briery-Clover as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Sep 2019 to Dec 2026 (6 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: Dominion (1 filing).

1active projects
54active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-162 Briery-Clover 230kV 230 168.9 Solar Withdrawn Oct 2019
AG1-176 Briery-Clover 230 kV 230 89.7 Solar Withdrawn Nov 2023
AG1-098 Finneywood Solar 230 64.2 Solar Withdrawn Dec 2024
AD1-088 Seven Bridges Solar 230 54 Solar Suspended Dec 2026
AE2-182 Seven Bridges Solar 230 11.6 Solar Withdrawn Dec 2025
AD2-200 Briery-Clover 230 kV 230 9.5 Solar Withdrawn Sep 2019

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Prince Edward County, VA

All 20 PJM queue filings in Prince Edward County, VA.

Other PJM queue substations in Mecklenburg County, VA

All 61 PJM queue filings in Mecklenburg County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first