1 active project totalling 54 MW in the PJM queue, plus 5 with terminal status (shown greyed).
1active projects
54active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC1-162 | Briery-Clover 230kV | 230 | 168.9 | Solar | Withdrawn |
| AG1-176 | Briery-Clover 230 kV | 230 | 89.7 | Solar | Withdrawn |
| AG1-098 | Finneywood Solar | 230 | 64.2 | Solar | Withdrawn |
| AD1-088 | Seven Bridges Solar | 230 | 54 | Solar | Suspended |
| AE2-182 | Seven Bridges Solar | 230 | 11.6 | Solar | Withdrawn |
| AD2-200 | Briery-Clover 230 kV | 230 | 9.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.