Beechwood DP-Palmer Springs substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD1-050 Beechwood DP-Palmer Springs 115 kV 115 29.1 Hybrid Withdrawn
AB2-089 Beechwood DP-Palmer Springs 115 kV 115 13.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.