Beechwood DP-Palmer Springs substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Beechwood DP-Palmer Springs as the point of interconnection, all in Mecklenburg County, VA.

Target commercial operation dates as filed run from Jun 2017 to Dec 2019 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD1-050 Beechwood DP-Palmer Springs 115 kV 115 29.1 Hybrid Withdrawn Dec 2019
AB2-089 Beechwood DP-Palmer Springs 115 kV 115 13.2 Solar Withdrawn Jun 2017

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Mecklenburg County, VA

All 61 PJM queue filings in Mecklenburg County, VA.