Altavista substation interconnection queue
2 active projects totaling 64 MW in the PJM queue.
2 PJM queue filings name Altavista as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Jun 2006 to Dec 2013 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X1-084 | Altavista Power Station | 115 | 60 | Other | In Service | Dec 2013 |
| O06_DP01 | Pittsylvania | 115 | 4 | Other | In Service | Jun 2006 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Altavista” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
Other PJM queue substations in Campbell County, VA
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Candler's Mountain: 2 active, 54.4 MW of 2 filed
- Reusens: 1 active, 4 MW of 3 filed
- Gladys DP-Stone Mill: none active of 2 filed
- Gladys DP-Stonemill: 1 active, 0 MW of 2 filed
Other PJM queue substations in Pittsylvania County, VA
- AXTON: 2 active, 870 MW of 5 filed
- East Danville - Roxborough: 2 active, 155 MW of 2 filed
- Garner-Northern Neck: 3 active, 145.4 MW of 6 filed
- Berry Hill: 2 active, 96.3 MW of 3 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Bearskin: 2 active, 45.6 MW of 3 filed
- Axton: 1 active, 41.9 MW of 7 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Gretna-Mt. Airy: none active of 3 filed
- East Danville - Roxboro: none active of 2 filed
- Shockoe DP-Chatham: none active of 2 filed