AXTON substation interconnection queue
2 active projects totaling 870 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name AXTON as the point of interconnection, all in VA.
Target commercial operation date as filed: Apr 2029 (5 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (5 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2109 | AXTON 765 kV | 765 | 650 | Gas | Withdrawn | Apr 2029 |
| C01-2110 | AXTON 765 kV | 765 | 650 | Gas | Withdrawn | Apr 2029 |
| C01-1714 | AXTON 765 kV | 765 | 520 | Gas | Withdrawn | Apr 2029 |
| C01-1931 | AXTON 765 kV | 765 | 520 | Gas | Active | Apr 2029 |
| C01-2108 | AXTON 765 kV | 765 | 350 | Battery | Active | Apr 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
3 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-2109 | Terminal status | 650 | Active → Withdrawn |
| 2026-09-28 | C01-2110 | Terminal status | 650 | Active → Withdrawn |
| 2026-09-28 | C01-1714 | Terminal status | 520 | Active → Withdrawn |
Same name on other Substation Scout pages
Other sources that print a substation named “AXTON” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Axton: PJM interconnection queue (VA)
Other PJM queue substations in Pittsylvania County, VA
- East Danville - Roxborough: 2 active, 155 MW of 2 filed
- Garner-Northern Neck: 3 active, 145.4 MW of 6 filed
- Berry Hill: 2 active, 96.3 MW of 3 filed
- Altavista: 2 active, 64 MW of 2 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Bearskin: 2 active, 45.6 MW of 3 filed
- Axton: 1 active, 41.9 MW of 7 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Gretna-Mt. Airy: none active of 3 filed
- East Danville - Roxboro: none active of 2 filed
- Shockoe DP-Chatham: none active of 2 filed
Other PJM queue substations in Henry County, VA
- Stockton: 2 active, 75.6 MW of 6 filed
- Axton: 1 active, 41.9 MW of 7 filed
- Smith Mountain: 1 active, 34 MW of 2 filed