Substation Scout

Reedy Creek- Kinderton substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Reedy Creek- Kinderton as the point of interconnection, all in Mecklenburg County, VA.

Target commercial operation date as filed: Dec 2025 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-363 Reedy Creek- Kinderton 115kV 115 50 Battery Withdrawn Dec 2025
AH1-362 Reedy Creek- Kinderton 115kV 115 45 Solar Withdrawn Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Mecklenburg County, VA

All 61 PJM queue filings in Mecklenburg County, VA.