Substation Scout

Chase City-Drakes Branch substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-427 Chase City-Drakes Branch 115 kV 115 71.1 Solar Withdrawn
AG2-630 Chase City-Drakes Branch 115 kV 115 47.4 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.