Grit DP-Perth substation interconnection queue
1 active project totalling 61.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
61.2active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-292 | Grit DP-Perth 115 kV | 115 | 76.2 | Solar | Withdrawn |
| AE2-291 | Hillandale Solar | 115 | 61.2 | Solar | EP |
| AG1-539 | Grit DP-Perth 115 kV | 115 | 32 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.