Grit DP-Perth substation interconnection queue

1 active project totalling 61.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
61.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-292 Grit DP-Perth 115 kV 115 76.2 Solar Withdrawn
AE2-291 Hillandale Solar 115 61.2 Solar EP
AG1-539 Grit DP-Perth 115 kV 115 32 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.