Grit DP-Perth substation interconnection queue

1 active project totaling 61.2 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Grit DP-Perth as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Apr 2021 to May 2030 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: Dominion (3 filings).

1active projects
61.2active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-292 Grit DP-Perth 115 kV 115 76.2 Solar Withdrawn Apr 2021
AE2-291 Hillandale Solar 115 61.2 Solar EP May 2030
AG1-539 Grit DP-Perth 115 kV 115 32 Battery Withdrawn Oct 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Campbell County, VA

All 26 PJM queue filings in Campbell County, VA.

Other PJM queue substations in Pittsylvania County, VA

All 39 PJM queue filings in Pittsylvania County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first