Grit DP-Perth substation interconnection queue
1 active project totaling 61.2 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Grit DP-Perth as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Apr 2021 to May 2030 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (3 filings).
1active projects
61.2active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-292 | Grit DP-Perth 115 kV | 115 | 76.2 | Solar | Withdrawn | Apr 2021 |
| AE2-291 | Hillandale Solar | 115 | 61.2 | Solar | EP | May 2030 |
| AG1-539 | Grit DP-Perth 115 kV | 115 | 32 | Battery | Withdrawn | Oct 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Campbell County, VA
- Altavista: 2 active, 64 MW of 2 filed
- Smith Mountain-Candler's Mountain: 2 active, 54.4 MW of 2 filed
- Reusens: 1 active, 4 MW of 3 filed
- Gladys DP-Stone Mill: none active of 2 filed
- Gladys DP-Stonemill: 1 active, 0 MW of 2 filed
Other PJM queue substations in Pittsylvania County, VA
- AXTON: 2 active, 870 MW of 5 filed
- East Danville - Roxborough: 2 active, 155 MW of 2 filed
- Garner-Northern Neck: 3 active, 145.4 MW of 6 filed
- Berry Hill: 2 active, 96.3 MW of 3 filed
- Altavista: 2 active, 64 MW of 2 filed
- Smith Mountain-Bearskin: 2 active, 45.6 MW of 3 filed
- Axton: 1 active, 41.9 MW of 7 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Gretna-Mt. Airy: none active of 3 filed
- East Danville - Roxboro: none active of 2 filed
- Shockoe DP-Chatham: none active of 2 filed