Palmer Springs substation interconnection queue

2 active projects totalling 240 MW in the PJM queue, plus 7 with terminal status (shown greyed).

2active projects
240active MW
9total filed
Queue IDProjectkVMWResourceStatus
C01-1988 Palmer Springs 115 kV 115 140 Battery Active
C01-2006 Palmer Springs 115 kV 115 100 Battery Active
AG2-641 Palmer Springs 115 kV 115 48 Solar Withdrawn
AG1-440 Palmer Springs 115 kV 115 45 Solar Withdrawn
AG1-441 Palmer Springs 115 kV 115 45 Solar Withdrawn
AJ1-003 Palmer Springs 115 kV 115 40 Battery Withdrawn
AG2-642 Palmer Springs 115 kV 115 32 Battery Withdrawn
AG1-445 Palmer Springs 115 kV 115 26 Battery Withdrawn
AG1-446 Palmer Springs 115 kV 115 26 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.