Pittsylvania, VA interconnection queue

16 active projects totalling 2,051.1 MW in the PJM queue, plus 23 with terminal status (shown greyed).

16active projects
2,051.1active MW
39total filed
Queue IDProjectkVMWResourceStatus
C01-2109 AXTON 765 kV 765 650 Gas Active
C01-2110 AXTON 765 kV 765 650 Gas Active
AE1-121 Axton 138 kV 138 483 Gas Withdrawn
AE1-122 Axton 138 kV 138 483 Gas Withdrawn
AH2-322 East Danville-Smith Mountain 138 kV 138 174 Solar Withdrawn
AH1-314 East Danville 138 kV 138 100 Battery Active
AD2-023 Firefly Solar 230 95 Solar Engineering and Procurement
AE1-250 Blue Ridge Solar 138 90 Solar Under Construction
C01-1902 AE2-140 Tap - Danville 138 138 kV 138 85 Battery Active
AG2-152 Banister-Bear Skin 138 kV 138 79 Solar Active
AF1-049 Southern Virginia Solar 138 75 Solar Under Construction
AI1-021 Hillandale 115kV 115 63 Solar Withdrawn
AE2-291 Hillandale Solar 115 61.2 Solar EP
AD2-022 Firefly Solar 230 60 Solar Engineering and Procurement
X2-029 Danville-East Danville 138kV 138 55 Not reported Withdrawn
AC1-083 Maplewood Solar 138 38 Solar In Service
AE2-187 Shockoe Solar Farm 69 36 Solar Withdrawn
AH1-447 Axton – Danville #2 138 kV 138 36 Battery Withdrawn
AH2-404 East Danville - Banister 138kV 138 35 Hybrid Withdrawn
AG1-547 Mount Airy-Chatham 69 kV 69 32.5 Hybrid Withdrawn
AI2-125 East Danville - Roxboro 230 kV 230 32.2 Solar Withdrawn
AG1-539 Grit DP-Perth 115 kV 115 32 Battery Withdrawn
AG1-540 Berry Hill 138 kV 138 21.4 Battery Withdrawn
AG2-272 Berry Hill 138 kV 138 21.3 Battery Active
AH1-129 Gretna-Mt. Airy 69kV 69 20 Battery Withdrawn
AH1-130 Gretna-Mt. Airy 69kV 69 20 Battery Withdrawn
AH1-131 Gretna-Mt. Airy 69kV 69 20 Battery Withdrawn
AC1-145 Whitethorn Solar 69 19 Solar In Service
AI2-126 East Danville - Roxboro 230 kV 230 16.8 Solar Withdrawn
AC1-042 Sycamore Solar I 69 16 Solar In Service
AI2-271 Smith Mountain-Bearskin 138 kV 138 14.4 Solar Withdrawn
AD2-081 Banister 34.5kV 34.5 13.8 Solar Withdrawn
AC2-057 Ridgeway-Dan River 69kV 69 7.6 Solar Withdrawn
AD1-017 Maplewood Solar 138 7.6 Solar In Service
AE1-230 Shockoe 69 kV 69 7.2 Hybrid Withdrawn
AC1-146 Chatham 69kV 69 5.7 Solar Withdrawn
AI2-275 Garner-Northern Neck 115 kV 115 5 Solar Withdrawn
O06_DP01 Pittsylvania 115 4 Other In Service
AG1-209 Gretna 12.5 kV 12.5 2.8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.