Gretna-Mt. Airy substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-129 | Gretna-Mt. Airy 69kV | 69 | 20 | Battery | Withdrawn |
| AH1-130 | Gretna-Mt. Airy 69kV | 69 | 20 | Battery | Withdrawn |
| AH1-131 | Gretna-Mt. Airy 69kV | 69 | 20 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.