Gretna-Mt. Airy substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Gretna-Mt. Airy as the point of interconnection, all in Pittsylvania County, VA.
Target commercial operation date as filed: Feb 2023 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-129 | Gretna-Mt. Airy 69kV | 69 | 20 | Battery | Withdrawn | Feb 2023 |
| AH1-130 | Gretna-Mt. Airy 69kV | 69 | 20 | Battery | Withdrawn | Feb 2023 |
| AH1-131 | Gretna-Mt. Airy 69kV | 69 | 20 | Battery | Withdrawn | Feb 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Pittsylvania County, VA
- AXTON: 2 active, 870 MW of 5 filed
- East Danville - Roxborough: 2 active, 155 MW of 2 filed
- Garner-Northern Neck: 3 active, 145.4 MW of 6 filed
- Berry Hill: 2 active, 96.3 MW of 3 filed
- Altavista: 2 active, 64 MW of 2 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Bearskin: 2 active, 45.6 MW of 3 filed
- Axton: 1 active, 41.9 MW of 7 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- East Danville - Roxboro: none active of 2 filed
- Shockoe DP-Chatham: none active of 2 filed