Central VA- Chase City substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Central VA- Chase City as the point of interconnection, all in Mecklenburg County, VA.
Target commercial operation dates as filed run from Dec 2026 to Dec 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-272 | Central VA- Chase City 115kV | 115 | 100 | Battery | Withdrawn | Dec 2027 |
| AH2-271 | Central VA- Chase City 115kV | 115 | 90 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Mecklenburg County, VA
- Evans Creek: 3 active, 440 MW of 3 filed
- Palmer Springs: 2 active, 240 MW of 9 filed
- Chase City-Lunenburg: 2 active, 132.4 MW of 3 filed
- Briery-Clover: 1 active, 54 MW of 6 filed
- Buggs Island-Chase City: 3 active, 36 MW of 3 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Chase City: 1 active, 18.9 MW of 7 filed
- Boydton Plank Road: none active of 4 filed
- Beechwood DP-Palmer Springs: none active of 2 filed
- Boydton DP: none active of 2 filed
- Chase City-Drakes Branch: none active of 2 filed
- Kerr Dam - Buggs Island: none active of 2 filed
- Reedy Creek- Kinderton: none active of 2 filed