Garner-Northern Neck substation interconnection queue

3 active projects totalling 145.4 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
145.4active MW
6total filed
Queue IDProjectkVMWResourceStatus
AE1-155 Bookers Mill Solar 115 76.2 Solar In Service
AI2-279 Garner-Northern Neck 115 kV 115 43 Battery Withdrawn
AF2-036 Garner-Northern Neck 115 kV 115 37.2 Solar Withdrawn
AF2-120 Cerulean Solar and Mulberry BESS 115 37.2 Solar UC-ISP
AG1-536 Cerulean Solar and Mulberry BESS 115 32 Battery EP
AI2-275 Garner-Northern Neck 115 kV 115 5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.