3 active projects totaling 145.4 MW in the PJM queue, plus 3 with terminal status (shown grayed).

6 PJM queue filings name Garner-Northern Neck as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Feb 2023 to May 2031 (6 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (2 filings).

3active projects
145.4active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-155 Bookers Mill Solar 115 76.2 Solar In Service May 2024
AI2-279 Garner-Northern Neck 115 kV 115 43 Battery Withdrawn Dec 2026
AF2-036 Garner-Northern Neck 115 kV 115 37.2 Solar Withdrawn Oct 2023
AF2-120 Cerulean Solar and Mulberry BESS 115 37.2 Solar UC-ISP May 2031
AG1-536 Cerulean Solar and Mulberry BESS 115 32 Battery EP May 2031
AI2-275 Garner-Northern Neck 115 kV 115 5 Solar Withdrawn Feb 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in City of Richmond, VA

All 6 PJM queue filings in City of Richmond, VA.

Other PJM queue substations in Richmond County, VA

All 11 PJM queue filings in Richmond County, VA.

Other PJM queue substations in Pittsylvania County, VA

All 39 PJM queue filings in Pittsylvania County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first