Chase City substation interconnection queue
1 active project totalling 18.9 MW in the PJM queue, plus 6 with terminal status (shown greyed).
1active projects
18.9active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-450 | Chase City 115kV | 115 | 50 | Battery | Withdrawn |
| AB2-090 | Chase City 34.5kV | 34.5 | 23.8 | Solar | Withdrawn |
| AB2-043 | Bluestone Farm Solar | 115 | 18.9 | Solar | In Service |
| AC1-106 | Chase City 115kV | 115 | 15.7 | Solar | Withdrawn |
| AE2-258 | Chase City 115 kV | 115 | 14.1 | Solar | Withdrawn |
| AB2-176 | Chase City 34.5kV | 34.5 | 9.8 | Solar | Withdrawn |
| AG2-019 | Chase City 12.5 kV | 12.5 | 6 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.