Chase City-Lunenburg substation interconnection queue
2 active projects totaling 132.4 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Chase City-Lunenburg as the point of interconnection, all in VA.
Target commercial operation dates as filed run from May 2020 to Dec 2027 (3 filings). 1 active filing targets a date after November 27, 2026.
2active projects
132.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-033 | Red Brick Solar | 115 | 78 | Solar | Under Construction | Dec 2027 |
| AB2-060 | Chase City Solar | 115 | 54.4 | Solar | In Service | May 2020 |
| AI2-222 | Chase City-Lunenburg 115kV | 115 | 47.8 | Solar | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Lunenburg County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Lunenburg - Nutbush: 2 active, 56 MW of 2 filed
- Gary: 2 active, 12.3 MW of 4 filed
- Briery DP-Clover: none active of 2 filed
Other PJM queue substations in Mecklenburg County, VA
- Evans Creek: 3 active, 440 MW of 3 filed
- Palmer Springs: 2 active, 240 MW of 9 filed
- Briery-Clover: 1 active, 54 MW of 6 filed
- Buggs Island-Chase City: 3 active, 36 MW of 3 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Chase City: 1 active, 18.9 MW of 7 filed
- Boydton Plank Road: none active of 4 filed
- Beechwood DP-Palmer Springs: none active of 2 filed
- Boydton DP: none active of 2 filed
- Central VA- Chase City: none active of 2 filed
- Chase City-Drakes Branch: none active of 2 filed
- Kerr Dam - Buggs Island: none active of 2 filed
- Reedy Creek- Kinderton: none active of 2 filed