Substation Scout

Boydton Plank Road substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG2-631 Boydton Plank Road 115 kV 115 90 Solar Withdrawn
AG2-632 Boydton Plank Road 115 kV 115 80 Battery Withdrawn
AH1-052 Boydton Plank Road 115 kV 115 36 Solar Withdrawn
AI1-016 Boydton Plank Road 115 kV 115 24 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.