Berry Hill substation interconnection queue

2 active projects totalling 96.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
96.3active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF1-049 Southern Virginia Solar 138 75 Solar Under Construction
AG1-540 Berry Hill 138 kV 138 21.4 Battery Withdrawn
AG2-272 Berry Hill 138 kV 138 21.3 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.