Axton substation interconnection queue

1 active project totalling 41.9 MW in the PJM queue, plus 6 with terminal status (shown greyed).

1active projects
41.9active MW
7total filed
Queue IDProjectkVMWResourceStatus
AB2-145 Axton 138kV 138 572 Gas Withdrawn
AE1-121 Axton 138 kV 138 483 Gas Withdrawn
AE1-122 Axton 138 kV 138 483 Gas Withdrawn
AB2-146 Axton 138kV 138 382 Gas Withdrawn
AG2-414 Axton 138 kV 138 210 Hybrid Withdrawn
AD2-216 Axton 138 kV 138 43.9 Solar Withdrawn
AE1-100 Caden Energix Axton 138 41.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.