Shockoe DP-Chatham substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Shockoe DP-Chatham as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Sep 2020 to Dec 2022 (2 filings).
Transmission owner as filed: Dominion (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-187 | Shockoe Solar Farm | 69 | 36 | Solar | Withdrawn | Sep 2020 |
| AF2-403 | Shockoe Storage / Shockoe DP-Chatham 69 kV | 69 | 8 | Battery | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Pittsylvania County, VA
- AXTON: 2 active, 870 MW of 5 filed
- East Danville - Roxborough: 2 active, 155 MW of 2 filed
- Garner-Northern Neck: 3 active, 145.4 MW of 6 filed
- Berry Hill: 2 active, 96.3 MW of 3 filed
- Altavista: 2 active, 64 MW of 2 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Bearskin: 2 active, 45.6 MW of 3 filed
- Axton: 1 active, 41.9 MW of 7 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Gretna-Mt. Airy: none active of 3 filed
- East Danville - Roxboro: none active of 2 filed
Other PJM queue substations in Fluvanna County, VA
- Cunningham - Elmont: 2 active, 3,238 MW of 3 filed
- Bremo: 3 active, 2,185 MW of 4 filed
- Cunningham: 6 active, 1,704.6 MW of 7 filed
- Bremo-Kidds Store: none active of 2 filed
- Fork Union: none active of 2 filed
- Kidds Store - Fork Union II: none active of 2 filed
Site Scanner