East Danville - Roxboro substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name East Danville - Roxboro as the point of interconnection, all in Pittsylvania County, VA.
Target commercial operation date as filed: Dec 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-125 | East Danville - Roxboro 230 kV | 230 | 32.2 | Solar | Withdrawn | Dec 2024 |
| AI2-126 | East Danville - Roxboro 230 kV | 230 | 16.8 | Solar | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Pittsylvania County, VA
- AXTON: 2 active, 870 MW of 5 filed
- East Danville - Roxborough: 2 active, 155 MW of 2 filed
- Garner-Northern Neck: 3 active, 145.4 MW of 6 filed
- Berry Hill: 2 active, 96.3 MW of 3 filed
- Altavista: 2 active, 64 MW of 2 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Bearskin: 2 active, 45.6 MW of 3 filed
- Axton: 1 active, 41.9 MW of 7 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Gretna-Mt. Airy: none active of 3 filed
- Shockoe DP-Chatham: none active of 2 filed