East Danville - Roxboro substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-125 East Danville - Roxboro 230 kV 230 32.2 Solar Withdrawn
AI2-126 East Danville - Roxboro 230 kV 230 16.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.