Kerr Dam - Buggs Island substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Kerr Dam - Buggs Island as the point of interconnection, all in Mecklenburg County, VA.
Target commercial operation date as filed: Dec 2025 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-045 | Kerr Dam - Buggs Island 115kV | 115 | 40 | Hybrid | Withdrawn | Dec 2025 |
| AH2-046 | Kerr Dam - Buggs Island 115kV | 115 | 12 | Solar | Withdrawn | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Mecklenburg County, VA
- Evans Creek: 3 active, 440 MW of 3 filed
- Palmer Springs: 2 active, 240 MW of 9 filed
- Chase City-Lunenburg: 2 active, 132.4 MW of 3 filed
- Briery-Clover: 1 active, 54 MW of 6 filed
- Buggs Island-Chase City: 3 active, 36 MW of 3 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Chase City: 1 active, 18.9 MW of 7 filed
- Boydton Plank Road: none active of 4 filed
- Beechwood DP-Palmer Springs: none active of 2 filed
- Boydton DP: none active of 2 filed
- Central VA- Chase City: none active of 2 filed
- Chase City-Drakes Branch: none active of 2 filed
- Reedy Creek- Kinderton: none active of 2 filed
Site Scanner