Boydton DP substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Boydton DP as the point of interconnection, all in Mecklenburg County, VA.
Target commercial operation dates as filed run from Dec 2028 to Oct 2030 (2 filings).
Transmission owner as filed: Dominion (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1987 | Boydton DP 115 kV | 115 | 70 | Battery | Withdrawn | Oct 2030 |
| AJ1-001 | Boydton DP 115 kV | 115 | 50 | Battery | Withdrawn | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | C01-1987 | Terminal status | 70 | Active → Withdrawn |
Other PJM queue substations in Mecklenburg County, VA
- Evans Creek: 3 active, 440 MW of 3 filed
- Palmer Springs: 2 active, 240 MW of 9 filed
- Chase City-Lunenburg: 2 active, 132.4 MW of 3 filed
- Briery-Clover: 1 active, 54 MW of 6 filed
- Buggs Island-Chase City: 3 active, 36 MW of 3 filed
- Gretna DP: 1 active, 19 MW of 2 filed
- Chase City: 1 active, 18.9 MW of 7 filed
- Boydton Plank Road: none active of 4 filed
- Beechwood DP-Palmer Springs: none active of 2 filed
- Central VA- Chase City: none active of 2 filed
- Chase City-Drakes Branch: none active of 2 filed
- Kerr Dam - Buggs Island: none active of 2 filed
- Reedy Creek- Kinderton: none active of 2 filed