Boydton DP substation interconnection queue

1 active project totalling 70 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
70active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1987 Boydton DP 115 kV 115 70 Battery Active
AJ1-001 Boydton DP 115 kV 115 50 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.