East Danville - Roxborough substation interconnection queue
2 active projects totalling 155 MW in the PJM queue.
2active projects
155active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD2-023 | Firefly Solar | 230 | 95 | Solar | Engineering and Procurement |
| AD2-022 | Firefly Solar | 230 | 60 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.