Chickahominy substation interconnection queue
1 active project totaling 220.8 MW in the PJM queue, plus 10 with terminal status (shown grayed).
11 PJM queue filings name Chickahominy as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Nov 2019 to Aug 2031 (11 filings).
Transmission owner as filed: Dominion (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-107 | Chickahominy Power | 500 | 1,600 | Gas | Withdrawn | Mar 2024 |
| AB2-068 | C4GT | 500 | 1,060 | Gas | Withdrawn | Dec 2023 |
| AC1-164 | Chickahominy Solar 1 and 2 | 230 | 220.8 | Solar | Partially in Service - Under Construction | Mar 2026 |
| AF2-053 | Chickahominy 500kV | 500 | 200 | Gas | Withdrawn | Jun 2024 |
| AI1-013 | Chickahominy 230 kV | 230 | 200 | Battery | Withdrawn | Dec 2026 |
| C01-1373 | Chickahominy 230 kV | 230 | 200 | Battery | Withdrawn | Aug 2031 |
| AF1-329 | Chickahominy 230 kV | 230 | 172.5 | Solar | Withdrawn | Sep 2021 |
| AI2-296 | Chickahominy 230kV | 230 | 83.2 | Solar | Withdrawn | Jun 2025 |
| AH1-288 | Chickahominy 230kV | 230 | 43.2 | Battery | Withdrawn | Dec 2025 |
| AG2-639 | Chickahominy 230 kV | 230 | 20 | Battery | Withdrawn | Apr 2025 |
| AB1-135 | Charles City Solar | 34.5 | 14 | Solar | Withdrawn | Nov 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Chickahominy (DOM, 19 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-1373 | Terminal status | 200 | Active → Withdrawn |
Other PJM queue substations in Charles City, VA
- Providence Forge-Turner: none active of 2 filed