Orange, VA interconnection queue
4 active projects totalling 193.3 MW in the PJM queue, plus 19 with terminal status (shown greyed).
4active projects
193.3active MW
23total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-676 | Gordonsville 230 kV | 230 | 1,275.9 | Gas | Withdrawn |
| C01-2003 | Oak Green 230 kV | 230 | 150 | Battery | Active |
| AG1-288 | Lake of the Woods DP-Wilderness DP 115 kV | 115 | 96.6 | Solar | Withdrawn |
| AI2-040 | Orange 115kV | 115 | 75 | Battery | Withdrawn |
| AG1-502 | Oak Green 115 kV | 115 | 64 | Hybrid | Withdrawn |
| AG2-608 | Unionville - Locust 115 kV | 115 | 64 | Hybrid | Withdrawn |
| AG1-289 | Lake of the Woods DP-Wilderness DP 115 kV | 115 | 53.4 | Battery | Withdrawn |
| AG2-210 | Not reported | n/r | 44.3 | Solar | Withdrawn |
| AE1-010 | Locust Grove-Paytes 115 kV | 115 | 33 | Battery | Withdrawn |
| AG2-609 | Unionville - Locust Grove 115 kV | 115 | 32 | Hybrid | Withdrawn |
| AC1-076 | Pine Glade Solar | 115 | 23.8 | Solar | In Service |
| AG2-211 | Not reported | n/r | 20.8 | Solar | Withdrawn |
| AH1-123 | Locust Grove D.P. 34.5kV | 34.5 | 20 | Battery | Withdrawn |
| S97 | South Anna Unit 1 | 230 | 20 | Gas | Withdrawn |
| S98 | South Anna Unit 2 | 230 | 20 | Gas | Withdrawn |
| AE2-134 | Pine Glade Solar | 115 | 16.5 | Solar | In Service |
| AG1-503 | Oak Green 115 kV | 115 | 16 | Hybrid | Withdrawn |
| AD1-078 | Paytes 115 kV | 115 | 12.6 | Solar | Withdrawn |
| AG1-467 | Somerset 34.5 kV | 34.5 | 9.4 | Solar | Withdrawn |
| AG1-466 | Orange 34.5 kV | 34.5 | 8.4 | Solar | Withdrawn |
| U4-009 | Louisa Gas Turbines Units 1 through 5 | 230 | 3 | Gas | In Service |
| AB1-067 | Unionville 12.5kV | 12.5 | 0 | Solar | Withdrawn |
| AB2-062 | Unionville 115kV | 115 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.