Lake of the Woods DP-Wilderness DP substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-288 Lake of the Woods DP-Wilderness DP 115 kV 115 96.6 Solar Withdrawn
AG1-289 Lake of the Woods DP-Wilderness DP 115 kV 115 53.4 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.