Oak Green substation interconnection queue

1 active project totaling 150 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Oak Green as the point of interconnection, all in Orange County, VA.

Target commercial operation dates as filed run from Jun 2023 to Jul 2030 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: Dominion (3 filings).

1active projects
150active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-2003 Oak Green 230 kV 230 150 Battery Active Jul 2030
AG1-502 Oak Green 115 kV 115 64 Hybrid Withdrawn Jun 2023
AG1-503 Oak Green 115 kV 115 16 Hybrid Withdrawn Jun 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Oak Green Sub (DOM, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Orange County, VA

All 23 PJM queue filings in Orange County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first