Oak Green substation interconnection queue
1 active project totaling 150 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Oak Green as the point of interconnection, all in Orange County, VA.
Target commercial operation dates as filed run from Jun 2023 to Jul 2030 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2003 | Oak Green 230 kV | 230 | 150 | Battery | Active | Jul 2030 |
| AG1-502 | Oak Green 115 kV | 115 | 64 | Hybrid | Withdrawn | Jun 2023 |
| AG1-503 | Oak Green 115 kV | 115 | 16 | Hybrid | Withdrawn | Jun 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Oak Green Sub (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Orange County, VA
- Louisa: 2 active, 203 MW of 5 filed
- Locust Grove-Paytes: 2 active, 40.3 MW of 3 filed
- Somerset: 2 active, 11.8 MW of 14 filed
- Gordonsville: none active of 2 filed
- Lake of the Woods DP-Wilderness DP: none active of 2 filed
- Orange: none active of 2 filed
- Paytes: none active of 2 filed
- South Anna: none active of 2 filed
- Unionville: none active of 2 filed