Oak Green substation interconnection queue

1 active project totalling 150 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
150active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-2003 Oak Green 230 kV 230 150 Battery Active
AG1-502 Oak Green 115 kV 115 64 Hybrid Withdrawn
AG1-503 Oak Green 115 kV 115 16 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.